- Add 09-06-SUMMARY.md (integration test + phase summary plan) - Update STATE.md progress and metrics - Update ROADMAP.md phase 09 status - Mark RECON-INFRA-05/06/07/08 complete in REQUIREMENTS.md
5.0 KiB
5.0 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | |||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 09-osint-infrastructure | 06 | testing |
|
|
|
|
|
|
|
|
|
8min | 2026-04-05 |
Phase 9 Plan 06: Integration Test + Phase Summary
End-to-end integration test wiring Engine + LimiterRegistry + Stealth + RobotsCache + Dedup against a synthetic source, plus Phase 9 completion summary closing all 4 RECON-INFRA requirements.
Performance
- Duration: ~8 min
- Started: 2026-04-05T21:49:00Z
- Completed: 2026-04-05T21:57:00Z
- Tasks: 2
- Files created: 2
Accomplishments
pkg/recon/integration_test.go— two integration tests (TestReconPipelineIntegration,TestRobotsOnlyWhenRespectsRobots) passing09-PHASE-SUMMARY.md— documents requirement closure, decisions, handoff to Phase 10- All
go test ./pkg/recon/...,go vet ./...,go build ./...clean
Task Commits
- Task 1: End-to-end integration test —
a754ff7(test) - Task 2: Phase 09 summary —
d29a7d3(docs)
Files Created
/home/salva/Documents/apikey/pkg/recon/integration_test.go— integration tests exercising Engine + Limiter + Stealth + Robots + Dedup via a synthetictestSourceandtestWebSource/home/salva/Documents/apikey/.planning/phases/09-osint-infrastructure/09-PHASE-SUMMARY.md— Phase 9 completion summary
Decisions Made
- Integration test in package
recon(notrecon_test) — lets the test referenceuserAgents,Finding,NewRobotsCache, etc. directly without indirection - One duplicate pair instead of two — initial draft used two duplicate pairs (5 raw → 3 unique), but the plan explicitly asserts
4 == len(Dedup(raw)). RebuilttestSourceto emit 4 unique + 1 exact duplicate for a clean 5 → 4 collapse - Robots gating asserted via absence — the
testSourcepath never callsrc.Allowed, mirroring how a real Engine would skip robots whenRespectsRobots()==false; the test comments this explicitly
Deviations from Plan
Auto-fixed Issues
1. [Rule 1 - Bug] Corrected duplicate count in testSource
- Found during: Task 1 (first test run)
- Issue: Initial implementation emitted 5 findings with two duplicate pairs (dupes of items 0 and 1), so
Dedupcollapsed 5 → 3, tripping the plan'srequire.Equal(t, 4, ...)assertion. - Fix: Rewrote
testSource.Sweepto emit 4 unique findings + 1 exact duplicate (5 → 4 after Dedup). The plan's wording "2 are duplicates" was ambiguous; the plan's explicit assertion value (4) is the source of truth. - Files modified:
pkg/recon/integration_test.go - Verification:
go test ./pkg/recon/ -run 'TestReconPipelineIntegration' -count=1 -vpasses - Committed in:
a754ff7(Task 1 commit — fix folded into initial commit, never shipped broken)
Total deviations: 1 auto-fixed (Rule 1 bug in my own first draft) Impact on plan: None — the plan's asserted numbers guided the fix.
Issues Encountered
None beyond the self-inflicted duplicate count bug above.
Next Phase Readiness
- Phase 10 (GitHub recon) can start immediately against a stable, tested
pkg/reconcontract TestReconPipelineIntegrationprovides a template for source-specific integration tests in Phases 10-16- All 4 RECON-INFRA requirement IDs closed
Self-Check
/home/salva/Documents/apikey/pkg/recon/integration_test.goexists/home/salva/Documents/apikey/.planning/phases/09-osint-infrastructure/09-PHASE-SUMMARY.mdexists- Commit
a754ff7present in git log - Commit
d29a7d3present in git log go test ./pkg/recon/...passesgo vet ./...cleango build ./...clean
Self-Check: PASSED
Phase: 09-osint-infrastructure Completed: 2026-04-05